NO. | User Name | Project Name | Installed Capacity | Scope of Supply and Services |
1 | HUANENG GROUP | Huaneng Dalian Power Plant Phase I Unit Low Temperature Economizer Renovation Project | 3×350MW | DWSMQ30H type economizer |
2 | Tangshan Sanyou | Tangshan Sanyou Silicon Industry Co., Ltd. One Furnace One Machine Project Economizer Renovation Project | 480T/H | One furnace, one machine project φ 38×5 |
3 | Henan Investment Group | Renovation of Low Temperature Reheater Pipes and Front Wall Fixing Blocks on the Left and Right Sides of Unit # 1 at Nanyang Yahekou Power Generation Co., Ltd | 2×350MW | Retrofitting of low-temperature reheater pipelines on the left and right sides of Boiler #1, as well as the front wall fixing blocks |
4 | datang group | Overheating equipment for No.1 furnace of Datang Shuangyashan Thermal Power Plant | 2×350MW | Reheating under-temperature equipment of boiler No.1 |
5 | HUANENG GROUP | Huaneng Hegang Power Generation Co., Ltd. 1 # Boiler Rear Screen Superheater Tube | 2×300MW | Rear platen superheater tube of boiler #1 |
6 | Guodian Group | Maintenance of Unit 3 at Guodian Yuanbaoshan Power Generation Co., Ltd | 2×600MW | Maintenance spare parts for water-cooled walls of boiler No. 3, etc |
7 | datang group | Datang Beijing Gaojing Thermal Power Plant | 2×350MW | Low-temperature reheater tube bank |
8 | datang group | Datang Shuangyashan Thermal Power Plant | 2×350MW | Reheating under-temperature equipment of Boiler No. 2 |
9 | Liaoning Energy Investment Group | Liaoning Nenggang Power Plant | 2×200MW | Boiler heating surface tube material |
10 | HUANENG GROUP | Northern United Power Co., Ltd. Wuhai Thermal Power Plant | 2×330MW | Fabrication of the upper set of serpentine tubes and outlet tube bank for #2 boiler |
11 | HUANENG GROUP | Huaneng Jinan Huangtai Power Generation Co., Ltd | 2×330MW | #7 Water-cooled wall tube bank |
12 | datang group | Hebei Matou Power Generation Co., Ltd.'s "Upsizing the Big and Suppressing the Small" Heating Project | 2×300MW | Boiler heating surface tube material |
13 | Guoneng Group | Shanxi Lujin Wangqu Power Plant | 2×600MW | Heating surface header of No. 1 and No. 2 boilers |
14 | Guodian Group (Harbin Boiler Factory) | Guodian Ningxia Fangjiazhuang Power Plant | 2×1100MW | Main steam pipeline, reheat steam pipeline, feedwater pipeline, connecting pipeline of low-temperature economizer, inlet pipeline of low-temperature economizer, etc. of 1# and 2# boilers, as well as the bending processing of 1# feedwater pipeline and reheat steam pipeline |
15 | State Power Investment Corporation (Harbin Boiler Factory) | China Power Investment Corporation Xiexin Binhai Power Plant | 2×1050MW | 1# and 2# main steam pipelines, reheat steam pipelines, and boiler flame detection cooling air ducts |
16 | Huadian Group (Harbin Boiler Factory) | Anhui Huadian Wuhu Power Plant | 2×1000MW | 1# Reconnect the pipe |
17 | Yuedian Group (Harbin Boiler Factory) | Guangdong Yuedian Maoming Bohe Power Plant | 2×1000MW | 1. Inlet pipeline of water storage tank for 2# boiler, inlet pipeline of separator, connecting pipe of superheater, and reconnection pipe |
18 | Huaneng Group (Harbin Boiler Factory) | Huaneng Laiwu Power Plant | 2×1000MW | 1. Connecting pipe of 2# boiler superheater, inlet pipe of boiler water storage tank, inlet pipe of separator |
19 | Guodian Group (Harbin Boiler Factory) | Guodian Taizhou Power Plant | 2×1000MW | Main steam pipeline renovation |
20 | Xinfa Group (Harbin Boiler Factory) | Liaocheng Xinyuan Power Plant | 3×700MW | #9 Main steam pipeline, elbow |
21 | Jinlian Aluminum (Harbin Boiler Factory) | Inner Mongolia Jinlian Aluminum Co., Ltd | 8×660MW | Main steam pipes, reheat steam pipes, crossover pipes, and rerun pipes of 1#2#3#4# boilers, as well as the horizontal low-temperature reheaters at the lower part of 1#3#4# boilers |
22 | Shandong Hongqiao (Harbin Boiler Factory) | Shandong Hongqiao New Materials Co., Ltd | 3×660MW | 3# main steam pipeline, reheat steam pipeline, middle horizontal low-temperature reheater, upper horizontal low-temperature superheater |
23 | China Electric Power Construction (Harbin Boiler Factory) | Kasim Coal fired Power Plant in Pakistan | 2×660MW | Main steam pipeline and reheated steam pipeline of boiler 1#, main steam pipeline, reheated steam pipeline, water supply pipeline, and drainage pipeline of boiler 2# |
24 | Datang Group (Harbin Boiler Factory) | Datang Pingluo Power Plant | 2×660MW | three direct links |
25 | Xishan Group (Harbin Boiler Factory) | Gujiao Power Plant Phase III | 2×660MW | Drainage pipeline of hydrophobic expander |
26 | Guodian Group (Harbin Boiler Factory) | Guodian Hami Power Plant | 2×660MW | 1. Main steam pipeline and reheat steam pipeline of 2# boiler, etc |
27 | Datang Group (Harbin Boiler Factory) | Weixian Power Plant | 2×660MW | Inlet pipeline of 1# flash tank |
28 | China Resources Group (Harbin Boiler Factory) | China Resources Jinzhou Power Plant | 2×660MW | Upper and lower horizontal low-temperature reheaters of boiler 1, and final reheat headers of boilers 1 and 2 |
29 | China Resources Group (Harbin Boiler Factory) | China Resources Power Jiaozuo Power Plant | 2×660MW | Main steam pipeline, reheat steam pipeline, etc. of 2# boiler |
30 | TBEA (Harbin Boiler Factory) | Xinjiang Tianchi Energy Quasi Northeast First Power Plant | 2×660MW | Main steam pipeline, reheat steam pipeline, inlet and outlet pipelines of reheater, outlet pipeline of superheater, and final reheater header for boilers 1# and 2# |
31 | Middling coal Group (Harbin Boiler Works) | Middling coal Xinjiang Zhundong Wucaiwan North No.2 Power Plant 1# | 2×660MW | 1# main steam pipeline, reheat steam pipeline, and final reheat steam header |
32 | Luneng Group (Harbin Boiler Factory) | Luneng Baoqing Power Plant | 2×600MW | 2# main steam pipeline, reheat steam pipeline, and connecting pipe |
33 | Xinjiang Production and Construction Corps (Harbin Boiler Factory) | Xinjiang Production and Construction Corps Agricultural Eighth Division Tianshan Aluminum Industry Co., Ltd | 6×360MW | 9# main steam pipeline, reheat steam pipeline |
34 | Shaanxi Meixin (Harbin Boiler Factory) | Shaanxi Meixin Industrial Investment Co., Ltd | 4×350MW | 1. Main steam pipeline and reheat steam pipeline of 2# boiler, lower horizontal low-temperature reheater of 1# boiler, 3# final superheater header, and high-temperature reheater header |
35 | Tongmei Group (Harbin Boiler Factory) | Tongmei Yang High Heat Power Plant | 3×350MW | 1# and 2# superheater pipelines, reheater inlet and outlet pipelines, flash tank inlet pipelines, reconnection pipes, water wall connecting pipes, drain tank water supply pipelines, 2# water wall connecting pipes, 1# and 2# boiler reheater low temperature, etc., and storage tank drain pipeline bends |
36 | Inner Mongolia Huayun (Harbin Boiler Factory) | Inner Mongolia Huayun New Materials Self owned Power Plant | 3×350MW | 1. Main steam pipeline and reheat steam pipeline of 2# boiler, reheat connecting pipe and over-connecting pipe of 1#, 2# and 3# boilers, upper and lower horizontal low-temperature reheaters of 1# and 3# boilers, main steam and reheat steam tees, and drain flash tank discharge pipeline |
37 | Baosteel Group (Harbin Boiler Factory) | Baosteel Self owned Power Plant | 2×350MW | 1# and 2# boiler feedwater pipes, economizer connecting pipes |
38 | Datang Group (Harbin Boiler Factory) | Heilongjiang Datang Suihua Thermal Power Plant | 2×350MW | Main steam pipeline, reheat steam pipeline, feedwater pipeline, reheater inlet pipeline, superheater outlet pipeline, etc., of boilers 1# and 2# |
39 | Datang Group (Harbin Boiler Factory) | Datang Yan'an Power Plant | 2×350MW | Main steam pipeline, reheat steam pipeline, reheater inlet pipeline, superheater outlet pipeline, overflow pipeline of boilers 1# and 2#, high-temperature reheater header of boiler 1#, inlet header of last-stage superheater of boiler 2#, safety valve discharge pipeline, and drain flash tank discharge pipeline |
40 | Guodian Group (Harbin Boiler Factory) | Guodian Lanzhou Thermal Power Plant | 2×350MW | Inlet and outlet pipelines of the reheater, outlet pipeline of the superheater, and connecting pipe of 1# boiler, connecting pipe of 2# boiler, as well as 1# and 2# high-pressure heaters |
41 | Huaneng Group (Harbin Boiler Factory) | Huaneng Luntai Power Plant | 2×350MW | Upper horizontal low-temperature superheater of boiler 2# |
42 | Huaneng Group (Harbin Boiler Factory) | Huaneng Yushen Yulin Cogeneration | 2×350MW | Main steam pipeline, reheat steam pipeline, feedwater pipeline, inlet and outlet pipelines of reheater, outlet pipeline of superheater for 1# and 2# boilers, and overflow pipeline of 2# boiler |
43 | Huadian Group (Harbin Boiler Factory) | Jurong Power Plant Phase II | 2×350MW | three direct links |
44 | State Power Investment Corporation (Harbin Boiler Factory) | Liaoning Zhongdian Investment Benxi Thermal Power Plant | 2×350MW | Main steam pipeline, reheat steam pipeline, inlet and outlet pipelines of reheater, outlet pipeline of superheater, crossover pipe, overflow pipeline, and horizontal low-temperature superheater of 1# and 2# boilers |
45 | Mengneng Group (Harbin Boiler Factory) | Mengneng Xilinhot Thermal Power Plant | 2×350MW | Horizontal low-temperature reheaters and elbows on the upper and lower parts of boilers 1# and 2# |
46 | Hebei Construction Investment (Harbin Boiler Factory) | Hebei Construction Investment Chengde Shangbancheng Cogeneration | 2×350MW | 1. Main steam pipeline, reheat steam pipeline, connecting pipe, reconnection pipe, and feedwater pipeline of 2# boiler |
47 | Oriental Hope (Harbin Boiler Factory) | Xinjiang Oriental Hope # 1/2 Project | 2×350MW | Lower horizontal low-temperature reheater of boiler 1, elbows 1# and 2#, final reheater header, lower header of drum 1 |
48 | Binhua Group (Harbin Boiler Factory) | Shandong Yellow River Delta (Binzhou) Thermal Power Co., Ltd | 350MW | Main steam pipeline, reheated steam pipeline, high-temperature reheater header, platen superheater outlet header, and inlet and outlet headers of the final superheater of boiler #1 |
49 | Fushun Mining (Harbin Boiler Factory) | Fushun Mining Zhongji Thermal Power Co., Ltd | 2×300MW | 1. Inlet and outlet pipelines of the reheater and superheater for 2# boiler, as well as the low-temperature condition of the reheater for 2# boiler |
50 | State Power Investment Corporation (Harbin Boiler Factory) | China Power Investment Chifeng New City Thermal Power Plant | 2×300MW | 1. Main steam pipeline, reheated steam pipeline, crossover pipe, re-crossover pipe, downcomer, economizer outlet conduit, and distribution pipe of 2# boiler |
51 | Huaneng Group (Harbin Boiler Factory) | Huaneng Yingkou Xianren Island Power Plant | 3×350T/H | Economizer coil, low-temperature superheater, front platen superheater |